California HSR should use Tejon Pass

The current California HSR plan has significant flaws; a major mistake was selecting a detour via Palmdale instead of the direct route via I-5 across Tejon pass to connect Bakersfield to Los Angeles. The cost of the Palmdale route -- about $32 billion in current dollars -- is more than twice that of the direct link, and nobody wants to pay for it. The HSR project will be restricted to the Central Valley until the less expensive Tejon route is embraced.

Thursday, May 3, 2012

Letter to Sacramento Bee, 3/26/12

[Not published.]

Re: Dan Walters' op-ed piece, 3/23/12

The plan for high speed rail (HSR) in California should be drastically scaled back to a precursor system ("HSR lite") that can be built in a reasonable time frame for a reasonable cost. The target of under three-hour service between San Francisco and Los Angeles has already been effectively abandoned, and with it the need for 220 mph trains anywhere in between. HSR lite, with a maximum speed of around 125 mph, is a much better fit for the immediate passenger rail needs of the state. This alternative would be designed to provide greatly improved service in both the northern and southern urban areas, with a connection between them through the Central Valley via Tehachapi and Altamont passes. And it is affordable, with a probable cost of under $25 billion, compared to an estimated cost of well over $100 billion for the current plan for HSR.

No comments:

Post a Comment