The current California HSR plan has significant flaws; a major mistake was selecting a detour via Palmdale instead of the direct route via I-5 across Tejon pass to connect Bakersfield to Los Angeles. The cost of the Palmdale route -- about $32 billion in current dollars -- is more than twice that of the direct link, and nobody wants to pay for it. The HSR project will be restricted to the Central Valley until the less expensive Tejon route is embraced.

Saturday, September 8, 2012

Why California's HSR project is failing

Note: This posting was published in the Sacramento News & Review (Sept. 13, 2012) as a letter to the editor in response to an article in a recent issue of that journal.

In his article on the California high speed rail project ("The right track," 9/6/12), Max Pringle hints at why this effort is in deep trouble and unlikely to get built in its current guise: it is simply the wrong rail project for this state. The studies that led to the passage of Proposition 1A in 2008 were rigged to satisfy specific parochial concerns, foremost an alignment across Pacheco pass to serve San Jose and then up the Peninsula to terminate in San Francisco. The resulting system is at least twice as expensive and less useful than a sensible, more direct alignment utilizing Altamont pass in the north and Tejon pass (I-5) in the south. The cost of an initial system linking the Bay Area to the Los Angeles Basin should have been capped at $30 billion, which the current plan cannot deliver.

The current effort is almost certain to collapse within a couple of years: the initial segment between Bakersfield and Fresno has become politically toxic at the national level ("a railroad to nowhere"), and Congress is unlikely to follow through on appropriating federal funding for it. Perhaps this eventuality will allow a less expensive alternative to be pursued. In particular, the California HSR system should be built from south to north, starting with a link across Tejon pass from the L.A. Basin to Bakersfield. This segment alone generates over half of the full "Bay to Basin" ridership, at a cost of less than $12 billion. Moreover, it provides the missing rail link joining northern and southern California. No other 100-mile initial segment comes anywhere close to this performance.

No comments:

Post a Comment